A list of Operating Procedures is given in the Index Section of this Quality Assurance Manual. Quality Planning. The Quality Assurance Manual. Inspection and testing is carried out on completion of installation and. Certification Manual for Welding Inspectors CM:2000. Encyclopedia CM-00 Certification Manual for Welding Inspectors. NB9. CWI Body of. part of an overall weld quality assurance program. Welding inspection. Quality Assurance Manual INSPECTION AND TEST PROGRAM (continued) Surface Treatment Inspection Surface Preparation Bare steel components of steel structure, after fabrication shall be prepared by short blasting or sand.
NRC: Inspection Procedures. The Inspection Procedures highlighted in blue have an effective date that is different from the issue date. This page includes links to files in non- HTML format. See Plugins, Viewers, and Other Tools for more information.
Area. Chapter. Title. Issue Date. CN Number.
Word. Op. ESSIPInspection Procedures. IP3. 00. 50. Construction Permit Corporate Management Meeting. IP3. 03. 01. Second Corporate Management Meeting.
- Home > NRC Library > Document Collections > Inspection Manual > Inspection Procedures Inspection Procedures. Inspection of Quality Assurance Program Implementation During Construction of Non-Power Production and Utilization.
- This quality manual is only valid if all pages are at the same issue level as shown in. D 80201, index quality manual. The quality policy shows that our inspection body has got top management. commitment to impartiality.
- Assessment Body’s. 3.1 Quality System Manual Revision History. Documents under formal control include the Quality System Manual, Quality System Procedures. the Quality Inspection Sheets.
- Emerald Quarries Quality Control Manual Issue 1, 1 Sept 2006 Decretive Pebble, Concrete, Fill, Road Base, Sand Products, Bobcat, Loaders, Excavators, Roadtrains, Body and Dog 2 TABLE OF CONTENTS Page No. QUALTIY STATEMENT 1.
- ISO 17020 quality manual, procedures and quality records to aid in the implementation of the ISO 17020 accreditation requirements.
IP3. 07. 03. Management Meetings Entrance and Exit Interviews. IP3. 08. 00. Initial Management Meeting Materials Licensees. IP3. 50. 02. Early Site Permit Pre- Docketing Quality Assurance Controls Meeting. IP3. 50. 04. Pre- Docketing Early Site Permit Quality Assurance Controls Inspection. IP3. 50. 06. Post- Docketing Early Site Permit Quality Assurance Controls Inspection.
IP3. 50. 07. Quality Assurance Program Implementation During Construction and Pre- Construction Activities. IP3. 50. 12. Early Site Permit Quality Assurance Controls Assessment and Conclusion. IP3. 50. 17. Quality Assurance Implementation Inspection. IP3. 50. 34. Design Certification Testing Inspection.
IP3. 50. 60. Licensee Management of QA Activities. IP3. 50. 61. In- Depth QA Inspection of Performance. IP3. 50. 65. Procurement, Receiving, and Storage.
IP3. 51. 01. QA Program Implementation Inspection for Operational Programs. IP3. 53. 01. Preoperational Testing - Quality Assurance. IP3. 55. 01. QA for the Startup Test Program. IP3. 57. 40. QA Program (QA/OC Administration)0.
IP3. 57. 41. QA Program (Audits)0. IP3. 57. 42. QA Program (Document Control)0. IP3. 57. 43. QA Program (Maintenance)0. IP3. 57. 44. QA Program (Design Changes and Modifications)0. IP3. 57. 45. QA Program (Surveillance Testing and Calibration Control)0.
IP3. 57. 46. QA Program (Procurement Control)0. IP3. 57. 47. QA Program (Receipt, Storage and Handling of Equipment and Materials)0. IP3. 57. 48. QA Program (Records)0. IP3. 57. 49. QA Program (Test and Experiments)0.
IP3. 57. 50. QA Program Measuring And Test Equipment. IP3. 59. 60. QA Program Evaluation of Engineering Organization. IP3. 61. 00. Inspection of 1. CFR Part 2. 1 and Programs for Reporting Defects and Noncompliance.
IP3. 61. 00. 0. 1Inspection of 1. CFR 5. 0. 5. 5(e) Programs for Reporting Defects and Noncompliance During Construction. IP3. 63. 01. Operational Staffing. IP3. 63. 02. Part 5. Operational Staffing. IP3. 68. 01. Organization, Management, and Cost Controls at Permanently Shutdown Reactors.
IP3. 70. 02. Construction Refurbishment Process - Watts Bar Unit 2. IP3. 70. 51. Verification of As- Builts. IP3. 70. 55. Onsite Design Activities. IP3. 70. 60. 10 CFR 5. Risk- Informed Categorization and Treatment of Structures, Systems, and Components Inspection. IP3. 73. 01. Comparison of As- Built Plant to FSAR Description.
IP3. 77. 00. Design Changes and Modifications. IP3. 78. 01. Safety Reviews, Design Changes, and Modifications at Permanently Shutdown Reactors. IP3. 78. 04. Aircraft Impact Assessment.
IP3. 78. 05. Engineering Design Verification Inspections. IP4. 00. 01. Resolution of Employee Concerns. IP4. 00. 02. Inspections to Review Allegations.
IP4. 01. 00. Independent Safety Culture Assessment Follow- up. IP4. 03. 01. Safety Committee Activity. IP4. 06. 00. Licensee Program for Managing Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Closure. IP4. 08. 01. Self. Assessment, Auditing, and Corrective Action at Permanently Shutdown. Reactors. 08/1. 1/9. IP4. 13. 01. Pre- Licensing Review of Training and Qualification Programs 1.
IP4. 15. 00. Training and Qualification Effectiveness. IP4. 15. 01. Part 5.
Review of Training and Qualification Programs. IP4. 15. 02. Nuclear Power Plant Simulation Facilities. IP4. 20. 01. Emergency Operating Procedures.
IP4. 20. 51. Fire Prevention and Protection. IP4. 24. 00. Plant Procedures. IP4. 24. 01. Part 5.
Plant Procedures. IP4. 24. 50. Operating Procedures. IP4. 24. 51. Maintenance Procedures.
IP4. 24. 52. Emergency Procedures. IP4. 24. 53. Part 5. Operating Procedures Inspection. IP4. 24. 54. Emergency Operating Procedures. IP4. 27. 00. Plant Procedures. IP4. 30. 02. Routine Inspections of Nuclear Vendors. IP4. 30. 03. Reactive Inspections of Nuclear Vendors.
IP4. 30. 04. Inspection of Commercial- Grade Dedication Programs. IP4. 30. 05. NRC Oversight of Third- Party Organizations Implementing Quality Assurance Requirements. IP4. 50. 51. Geotechnical/Foundation Activities Procedure Review. IP4. 50. 51. AGeotechnical/Foundation Activities Record Review. IP4. 50. 52. Review of Geotechnical and Site Characterization Activities.
IP4. 50. 53. Geotechnical/Foundation Activities Work Observation. IP4. 50. 55. Geotechnical/Foundation Activities Record Review. IP4. 60. 51. Structural Concrete Procedure Review. IP4. 60. 53. Structural Concrete Work Observation. IP4. 60. 55. Structural Concrete Record Review. IP4. 60. 61. Structural Masonry Construction.
IP4. 60. 71. Concrete Expansion Anchors. IP4. 80. 51. Structural Steel and Supports Procedure Review. IP4. 80. 53. Structural Steel and Supports Work Observation.
IP4. 80. 55. Structural Steel and Supports Record Review. IP4. 90. 01. Inspection of Erosion/Corrosion Monitoring Programs. IP4. 90. 51. Reactor Coolant Pressure Boundary Piping QA Review. IP4. 90. 53. Reactor Coolant Pressure Boundary Piping - Work Observation. IP4. 90. 55. Reactor Coolant Pressure Boundary Piping Record Review. IP4. 90. 61. Safety- Related Piping - QA Review. IP4. 90. 63. Piping - Work Observation.
IP4. 90. 65. Safety- Related Piping- Records Review. IP5. 00. 01. Steam Generator Replacement Inspection. IP5. 00. 02. Steam Generators. IP5. 00. 03. Pressurizer Replacement Inspection. IP5. 00. 51. Reactor Vessels and Internals QA Review.
IP5. 00. 53. Reactor Vessel and Internals Work Observation. IP5. 00. 54. Reactor Vessel Material Surveillance Program.
IP5. 00. 55. Reactor Vessel and Internals Record Review. IP5. 00. 71. Safety- Related Components - Procedure Review.
IP5. 00. 73. Mechanical Components - Work Observation. IP5. 00. 75. Safety Related Components - Records Review. IP5. 00. 90. Pipe Support and Restrain Systems. IP5. 00. 95. Spent Fuel Storage Racks. IP5. 01. 00. Heating, Ventitaling, and Air Conditioning Systems. IP5. 10. 51. Electrical Components and Systems - Procedure Review. IP5. 10. 53. Electrical Components and Systems - Work Observation.
IP5. 10. 55. Electrical Components and Systems - Record Review. IP5. 10. 61. Electrical Cable - Procedure Review. IP5. 10. 63. Electric Cable - Work Observation. IP5. 10. 65. Electric Cable - Record Review. IP5. 10. 80. Part 5. Environmental Qualification (EQ) Under 1.
CFR 5. 0. 4. 91. 1/0. IP5. 20. 03. Digital Instrumentation And Control Modification Inspection.
IP5. 20. 51. Instrument Components and Systems - Procedure Review. IP5. 20. 53. Instrument Components and Systems - Work Observation. IP5. 20. 55. Instrument Components and Systems - Record Review. IP5. 30. 51. Containment Penetrations (Mechanical) Procedure Review. IP5. 30. 53. Containment Penetrations (Mechanical) Work Observation.
IP5. 30. 55. Containment Penetrations (Mechanical) Record Review. IP5. 50. 50. Nuclear Welding General Inspection Procedure. IP5. 50. 93. Reactor Vessels Internals (Welding) Observation of Welding and Associated Activities. IP5. 51. 00. Structural Welding General Inspection Procedure. IP5. 51. 50. Weld Verification Checklist. IP5. 67. 00. Calibration.
IP5. 70. 50. Nondestructive Examination Procedure Visual Examination Procedure Review/Work Observation/Record Review. IP5. 70. 60. Nondestructive Examination Procedure Liquid Penetrant Examination Procedure Review/Work Observation/Record Review. IP5. 70. 70. Nondestructive Examination Procedure Magnetic Particle Examination Procedure Review/Work Observation/Record Review. IP5. 70. 80. Nondestructive Examination Procedure Ultrasonice Examination Procedure Review/Work Observation/Record Review. IP5. 70. 90. Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review. IP6. 05. 01. Fuel Receipt and Storage.
IP6. 07. 05. Preparation for Refueling. IP6. 07. 10. Refueling Activities. IP6. 07. 15. Spent Fuel Safety at Operating Reactors. IP6. 08. 01. Spent Fuel Pool Safety at Permanently Shutdown Reactors. IP6. 08. 45. Operation of Inter- Unit Fuel Transfer Canister and Cask System.
IP6. 08. 51. Design Control of ISFSI Components. IP6. 08. 52. ISFSI Component Fabrication by Outside Fabricators. IP6. 08. 53. On. Site Fabrication of Components and Construction of an ISFSI0. IP6. 08. 54. Preoperational Testing of an ISFSI0. IP6. 08. 54. 1. Preoperational Testing of an Independent Spent Fuel Storage Facility Installations at Operating Plants.
IP6. 08. 55. Operation of an ISFSI0. IP6. 08. 55. 1. Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. IP6. 08. 56. Review of 1. CFR 7. 2. 2. 12(b) Evaluations. IP6. 08. 56. 1. Review of 1.
CFR 7. 2. 2. 12(b) Evaluations. IP6. 08. 57 Review of 1.
CFR 7. 2. 4. 8 Evaluations. IP6. 08. 58. Away- From- Reactor ISFSI Inspection Guidance. IP6. 17. 05. Calibration of Nuclear Instrumentation Systems. IP6. 17. 06. Core Thermal Power. Evaluation. 07/1.
IP6. 17. 07. Determination of Reactor. Shutdown Margin. 10/1. IP6. 17. 08. Isothermal and Moderator. Temperature Coefficient. Determinations. 10/1. IP6. 17. 09. Total Power Coefficient of Reactivity at Pressurized Water Reactors. IP6. 17. 10. Control Rod Worth Measurements.
IP6. 17. 15. Verification of Containment Integrity. IP6. 17. 20. Containment Local Leak Rate Testing. IP6. 17. 26. Surveillance Observations. IP6. 17. 28. Independent Measurement of RCS Leak Rates for a PWR0. IP6. 20. 02. Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants.
IP6. 20. 03. Inspection of Steel and Concrete Containments at Nuclear Power Plants. IP6. 27. 00. Maintenance Implementation. IP6. 27. 06. Maintenance Rule. IP6. 27. 08. Motor- Operated Valve Capability. IP6. 27. 09. Configuration Risk Assessment and Risk Management Process.